The Building of the Venturer
Series 3

Photos Courtesy of Mike Strizki (NJDOT) April 1999


27BATTs.JPG (3376 bytes) STRIZKIs.JPG (3250 bytes) DRIVERs.JPG (2726 bytes) ALPINE1s.JPG (3015 bytes)
27 Nicade batteries have been placed into three fitted battery boxes Mike Strizki working on front upgraded struts to increase vehicle handling characteristics View of empty battery boxes from drivers seat The Alpine Geograghic Positioning System (GPS) to be placed in the NJ Venturer
COMPRESSs.JPG (3231 bytes) CONTRs.JPG (3514 bytes) STACKs.JPG (3711 bytes) STACK2s.JPG (3727 bytes)
Mike Stizki working on compressing the strut springs The hydrogen fuel cell’s controller The hydrogen fuel cell stack and system placed into the envelope Another view of the fuel cell envelope
PLACEs.JPG (3976 bytes) REARVIEWs.JPG (3724 bytes) FRONT2s.JPG (3942 bytes)
The fuel cell envelope is placed in postiton and checked for fit Rearview of installed batteries A front view of the car with the fuel cell enveolope in center
alpines.jpg (2848 bytes) battery2s.jpg (2770 bytes) brackets.jpg (3536 bytes) bracket2s.jpg (3235 bytes)
The Alpine Geograghic Positioning System (GPS) to be placed in the NJ Venturer.
motors.jpg (3016 bytes) overhead2s.jpg (3060 bytes) overheads.jpg (2835 bytes) plates.jpg (3473 bytes)
studentss.jpg (2868 bytes) tanks.jpg (2779 bytes)

photo-dots.jpg (6964 bytes)

 


button1.gif (1207 bytes) button2.gif (1289 bytes) button3.gif (1232 bytes) button4.gif (1325 bytes) button5.gif (1355 bytes) button6.gif (1227 bytes) button7.gif (1341 bytes)
Please send comments and suggestions to szary@civeng.rutgers.edu.